Stalled Development Week: Adelbert Retaining Wall

Photos: Diane Edwardson. Above left: May 2005, record rainfall caused a landslide below 2596 Adelbert at the Red Car Property. Right: April 9, 2009 grading began for a retaining wall and support pilings to repair the slope. (Click on photos to enlarge.) Photos: Diane Edwardson. Above left: April 10, 2009. Right: April 23, 2009, work progressed reasonably, contractor drilled holes for pilings;

Related Posts: